Overview Purpose and Need Towpath Trail Maps Public Involvement Comments National Park Service Cuyahoga County Engineers Cuyahoga County Planning Commission DLZ Corporation Ohio Department of Transportation Cleveland City Planning Commission Cleveland Metroparks Ohio Canal Corridor

PUBLIC INVOLVEMENT

INTRODUCTION  |  PUBLIC MEETINGS
The first public meeting for the Towpath Trail Extension Project was an extremely positive event. On April 17, 2007 over 150 people attended the meeting at the Cleveland Metroparks Zoo Windows on the World Building. The atmosphere was supportive and everyone was excited to know the proposed trail alternatives and if their neighborhood would be connected to the proposed trail. The design team had several different display boards depicting different trail concepts and options, nearby facilities, possible interpretative and landscape regeneration alternatives. Please click on each item below to view the different boards presented at the public meeting.
 
 
Design Concepts Trail Regeneration Options Local Industrial Facilities Interpretive Options
Aerial Maps
Existing Condition
Harvard Avenue and River Crossing
Proposed Option 1
Proposed Option 2
Rail Road Crossing and Steel Yard Commons Landing
Profile Sheets
Harvard Avenue Crossing Options
Cuyahoga River Crossing
Rail Crossing
Elevated Structure to Steel Yard Commons Option 1
Elevated Structure to Steel Yard Commons Option 2
Rain Gardens
River Terrace Wetlands
Facilities
Landforms
Path Concept
Interpretive Themes and Significant Stories 1
Interpretive Themes and Significant Stories 2
Interpretive Themes and Significant Stories 3
Possible Exhibit Nodes 1
Possible Exhibit Nodes 2
After viewing the above images, click here to be taken to the comments page and leave feedback.